The process is normally limited to the flat or horizontal-fillet welding positions (although horizontal groove position welds have been done with a special arrangement to support the flux).
SAW pipe is made of hot rolled coiled steel by automatic submerged arc weld under normal atmospheric temperature. All the pipes are produced according to API Spec 5L, GB/T9711.1, GB/T9711.2, ASTM A252-89 standard. These pipes mainly used in petroleum and natural gas industry to transport flammable and non-flammable liquid and steel construction.
Size:
- (O.D×Wall Thickness)mm×Length(mm)
- 219-3200mm×5-30mm x 12000mm+500mm
- In addition to above specification, the pipes can be produced according to customer’s requirements.
Execute Standard:
- ASTM A252-89 WELDE AND SEAMLESS STEEL PIPE PILES
- API SPEC 5L Specification for Line Pipe
- GB/T9711.1 Petroleum and natural gas industries—Steel pipe for pipelines—Technical delivery conditions
- SY/T5037 Spiral submerged arc welded pipe for low pressure liquid transportation
Material:
Q235-Q345, L175-L485, SS400, 16Mn, L290-L360
or according to the customer's requirements.
Mainly usage:
Spiral welded steel pipes are widely used in Oil, Natural Gas, Water and other flammable & nonflammable liquid conveyance and distribution pipelines, steel structures for construction and other general purposes by means of their wide size range.
- Pipe Coating: HDPE/ 3PE/ 3PP/ Pipe cement mortar lining
- Mill Test Certificate: EN 10204/3.1B
- Third party inspection: SGS, BV, Lloyds etc.
Spiral Submerged-arc Welded Quality Assurance
Excellent Equipment:
There are nine modernized product lines in our company with the yield capacity of 1000 thousands tons of B-X80 steel pipe of φ219-φ3200mm, WT5-30mm.
|
|